PROJECT 02 / 07 · DATA ENGINEERING · INDUSTRY
Structure behind safety.
Translating technical railway specifications into structured data.
Illustrative data pipeline · Not a real railway signalling system
01 / THE CONTEXT
The challenge.
Railway signaling specifications carry complex relationships between messages, packets and variables; the engineering task was to turn them into a consistent, inspectable reference dataset.
02 / MY ROLE
Work with
purpose.
ERTMS Railway Data Analysis & Structuring Intern at JBS Business Services, July–August 2026.
03 / ENGINEERING NOTES
Analyzed public ERTMS/ETCS specifications, with emphasis on Movement Authority Message 3 and relevant packets.
Prepared normalized reference datasets and a structured data dictionary using Python, Pandas, Excel and CSV/JSON.
Drafted 10 prototype validation rules and technical documentation for early-stage V&V support.
04 / HIGH-LEVEL SYSTEM
From idea to structure.
Public-facing conceptual overview — not a disclosure of internal implementation.
05 / THE STACK
The tools
behind the work.
06 / MOTION STUDY
See the concept.
Fifteen seconds along a fictional railway: a position reference, a radio exchange, a structured Movement Authority, and a train that stays within its limit. An original illustration of public ETCS Level 2 concepts.
POSITION / 0–3 SEC
A reference along the railway.
The train passes a fictional Eurobalise. Onboard ETCS uses the balise group as a positioning reference, together with onboard odometry.
Original educational illustration. Positions and timing are fictional. No operational data, braking model or certified safety simulation. Trackside signals are context only; the radio authority comes from the RBC.
Simplified public ERTMS/ETCS concepts, fictional railway positions, and illustrative movement only. Not a real signalling or braking-system simulation.
07 / TRAINING RECORD
Learning the language of rail.
ERTMS e-learning — Certificate of Attendance
European Union Agency for Railways ·
Completion of the online course was self-declared. ERA does not certify or verify effective completion of the course. This attendance record does not independently establish practical competence.

The original PDF is retained privately.VIEW CERTIFICATE
Public technical themes only. No confidential employer materials, railway production systems, or certification claims.